March Manifest: 2 Slots Remaining | Active Audits in Salford, Kent, & London
🏢 2026 National Infrastructure Prospectus: Download Now
UK Wellness Infrastructure | 2026 Manifest

The End of the Lukewarm Local.

Commissioning industrial-spec 9kW recovery assets for the UK's leading residential and community sites.

9kW Industrial Core
40A Dedicated Feed
150mm Reinforced Raft
Flagship Commission

The IK Hero Suite

From £12,499

The "New Local." A high-capacity thermal lab engineered for rapid recovery, community use, and architectural permanence.

  • 9kW Virta Core: Reaches 90°C in under 25 minutes.
  • 40-Amp Infrastructure: Built for constant-duty cycles.
  • Sober Social Hub: Designed to replace the traditional pub.
Reserve Manifest Slot
9kW Industrial Heater Core
High-Velocity Tier

Nordic Classic

From £8,500

Industrial barrel geometry engineered for zero-cold-spot convection in coastal environments.

  • Coastal Spec: Precision-milled 42mm solid staves.
  • Arctic Retention: Built for the UK's most exposed sites.
  • Rapid Commissioning: Standard 3-week lead time.
Check Site Feasibility
The Engineering Standard

Why We Don't Use 13-Amp Plugs

Retail Grade

• 3kW - 4.5kW Power Output
• Standard 13A Domestic Plug
• Softwood / Low Density Staves
• Max Temp: 70°C (Slow Recovery)

IK Industrial

• 9kW Industrial Heater Core
• 40A Dedicated Power Feed
• High-Density Thermal Mass
• Max Temp: 95°C+ (Rapid Recovery)

Minimum Commissioning Standard

Infrastructure Schematic

All IK assets require a certified 40A industrial feed and a reinforced foundation.

40A Infrastructure